PROJECT

Overview

PROJECT CAPACITY:

423 MW

TURBINE:

94 locations utilizing Vestas V163-4.5MW™ turbine technology

SUBSTATION:

The project substation will be located off IL State Route 116 near I-39

COLLECTION:

34.5 kV collector system accompanied with fiber optic cabling

INTERCONNECTION:

Project will be interconnected to the grid through a new transmission substation connecting to the ComEd 345kV transmission system

SITE LOCATION:

Stay updated on the Panther Grove 1 Wind Energy Facility