PROJECT
Overview
PROJECT CAPACITY:
423 MW
TURBINE:
94 locations utilizing Vestas V163-4.5MW™ turbine technology
SUBSTATION:
The project substation will be located off IL State Route 116 near I-39
COLLECTION:
34.5 kV collector system accompanied with fiber optic cabling
INTERCONNECTION:
Project will be interconnected to the grid through a new transmission substation connecting to the ComEd 345kV transmission system
SITE LOCATION: